Concrete Line Pump Hire
£275.00
- All Costs Are Exclusive of VAT – VAT Applied at Checkout.
- Please Include Concrete Mix Type In The Additional Notes Field.
- Concrete Mix Must Use 10mm Aggregate.
- 1 x 25kg Bag of Cement Required For Distances Up To 20m – An Additional Bag of Cement Is Required For Every 20m Of Line After The First 20m.
- Cement Can Be Supplied At An Additional Cost.
- Additional Travel Time Costs May Be Applicable for Sites Outside of Torbay.
- The Site Must Have Suitable Facilities For Us To Wash Down The Pump After Works Are Complete.